aireupora(at)sbcglobal.ne Guest
|
Posted: Mon Jun 01, 2009 4:11 pm Post subject: picture is worth a thousand words |
|
|
I started to install my brake line and got as far as the 15" from center on the gear box/baggage bulkhead. I'm supose to drill a 1" hole in the aft bulkhead then a 1" hole in the fuselage. I have the X shaped tri-gear wooden frames in the baggage/gear box. 'When I place my speed fairing I'm about four inches behind the landing gear. It looks like I need to drill two holes through the wood frame to get in front of the landing gear. Before I drill am asking is there a better way?
Rick Stockton
A210
[quote][b]
| - The Matronics Europa-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?Europa-List |
|
|
|