Posted: Fri May 02, 2008 6:12 pm Post subject: Building Sequence - how long can I delay riveting the fiber |
|
|
Bill,
I fitted my cabin top and doors way back. Since then I have, put it on the gear, hung the engine & prop, installed all the wiring, the panel, finished the cowl/FWF/baffeling. Basically my -10 is complete without the top on. The top/windows and the pants/faring are all that's left to do shy of hanging the wings and final assembly..(yeah right) I found it so much easier to climb in and out without the cabin top on the fuselage. I'm afraid as soon as the top is on I'll see that bright light at the end of the tunnel and really start to think I'm done.
Rick Sked