  | 
				Matronics Email Lists Web Forum Interface to the Matronics Email Lists   
				 | 
			 
		 
		 
	
		| View previous topic :: View next topic   | 
	 
	
	
		| Author | 
		Message | 
	 
	
		poneill(at)irealms.com Guest
 
 
 
 
 
  | 
		
			
				 Posted: Tue Sep 25, 2007 3:46 am    Post subject: QB Wings: Page 16-2 Step 3 | 
				     | 
			 
			
				
  | 
			 
			
				I'm still working through double checking all the QB Wings+Fuse plan steps
 and encountered an issue with one of the uncompleted wing steps.
 
 Page 16-2 Step 3 where you #19 drill the center nut plate holes for the wing
 root fairing attach.  The center holes have not been drilled, so I am
 drilling them.  The problem is that there are 3 layers of aluminum already
 riveted together which must be drilled through: rib, wing walk doubler, and
 top skin.  When drilling out the center hole, I am getting bur/chip
 production between the layers.  
 
 I'm using a #19 jobber bit and going slow, but I am not able to avoid
 separation of the layers due to chips.  It's too tight to use a chip chaser
 without damaging the skins.  I was able to clean out the first two and then
 stopped to research before proceeding.
 
 Was this step completed for any others with QB wings or is this a standard
 task for the builder to complete?
 
 Any suggestions for avoiding the burrs/chips in between the layers while
 drilling?
 
 Best Regards,
 Patrick 40715
 
  |  | - The Matronics RV10-List Email Forum - |  |   |  Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
 
  http://www.matronics.com/Navigator?RV10-List |  
  |  
 
 
 
 
  | 
			 
		  | 
	 
	
		| Back to top | 
		 | 
	 
	
		  | 
	 
	
		ScooterF15
 
 
  Joined: 19 Jun 2006 Posts: 136
 
  | 
		
			
				 Posted: Tue Sep 25, 2007 5:49 am    Post subject: QB Wings: Page 16-2 Step 3 | 
				     | 
			 
			
				
  | 
			 
			
				Patrick,
   
  I had the same issue with my QB kit, although, I don't have any suggestions  for you. Just do the best you can. It is certainly a good idea to check  every step in the plans to make sure it was done and done correctly. I spent  probably a week checking/fixing stuff before actually starting work. I  found it quite disturbing that they failed to drill the center holes  for almost every single nut plate installed in the QB fuse. That makes  it pretty hard to drill and properly debur those holes (especially when  there are multiple layers of aluminum). Good luck. 
   
  -Jim
  40134 
   
  In a message dated 9/25/2007 7:47:50 A.M. Eastern Daylight Time,  poneill(at)irealms.com writes:
   	  | Quote: | 	 		  -->    RV10-List message posted by: "Patrick ONeill"    <poneill(at)irealms.com>
 
 I'm still working through double checking    all the QB Wings+Fuse plan steps
 and encountered an issue with one of the    uncompleted wing steps.
 
 Page 16-2 Step 3 where you #19 drill the center    nut plate holes for the wing
 root fairing attach.  The center holes    have not been drilled, so I am
 drilling them.  The problem is that    there are 3 layers of aluminum already
 riveted together which must be    drilled through: rib, wing walk doubler, and
 top skin.  When drilling    out the center hole, I am getting bur/chip
 production between the    layers.  
 
 I'm using a #19 jobber bit and going slow, but I am not    able to avoid
 separation of the layers due to chips.  It's too tight    to use a chip chaser
 without damaging the skins.  I was able to clean    out the first two and then
 stopped to research before    proceeding.
 
 Was this step completed for any others with QB wings or is    this a standard
 task for the builder to complete?
 
 Any suggestions    for avoiding the burrs/chips in between the layers    while
 drilling?
 
 Best Regards,
 Patrick  40715 | 	  
  
 
   
  Jim "Scooter"  McGrew
 http://www.mit.edu/~jsmcgrew
 
 See what's new at AOL.com and .
   [quote][b]
 
  |  | - The Matronics RV10-List Email Forum - |  |   |  Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
 
  http://www.matronics.com/Navigator?RV10-List |  
  |  
 
 
 
 
  | 
			 
		  | 
	 
	
		| Back to top | 
		 | 
	 
	
		  | 
	 
	
		jesse(at)saintaviation.co Guest
 
 
 
 
 
  | 
		
			
				 Posted: Tue Sep 25, 2007 7:07 am    Post subject: QB Wings: Page 16-2 Step 3 | 
				     | 
			 
			
				
  | 
			 
			
				If you use a couple of cleco clamps to hold the skins together, then run a #40 bit first, then #30 and then go up to #19, that should help a lot on the burrs.  The cleco clamps should do a fairly good job of holding the skins together.  Also, if you just put a little bit of pressure and let the bit do the work, the skins will not be separated as much while drilling.  
      
 Jesse Saint  
 Saint Aviation, Inc.  
 jesse(at)saintaviation.com (jesse(at)saintaviation.com)  
 www.saintaviation.com  
 Cell: 352-427-0285  
 Fax: 815-377-3694  
         
   
 From: JSMcGrew(at)aol.com [mailto:JSMcGrew(at)aol.com] 
  Sent: Tuesday, September 25, 2007 9:48 AM
  To: rv10-list(at)matronics.com
  Subject: Re: QB Wings: Page 16-2 Step 3  
   
          
 Patrick,  
     
    
     
 I had the same issue with my QB kit, although, I don't have any suggestions for you. Just do the best you can. It is certainly a good idea to check every step in the plans to make sure it was done and done correctly. I spent probably a week checking/fixing stuff before actually starting work. I found it quite disturbing that they failed to drill the center holes for almost every single nut plate installed in the QB fuse. That makes it pretty hard to drill and properly debur those holes (especially when there are multiple layers of aluminum). Good luck.   
     
    
     
 -Jim  
     
 40134   
     
    
     
 In a message dated 9/25/2007 7:47:50 A.M. Eastern Daylight Time, poneill(at)irealms.com writes:  
    	  | Quote: | 	 		    
 --> RV10-List message posted by: "Patrick ONeill" <poneill(at)irealms.com>
  
  I'm still working through double checking all the QB Wings+Fuse plan steps
  and encountered an issue with one of the uncompleted wing steps.
  
  Page 16-2 Step 3 where you #19 drill the center nut plate holes for the wing
  root fairing attach.  The center holes have not been drilled, so I am
  drilling them.  The problem is that there are 3 layers of aluminum already
  riveted together which must be drilled through: rib, wing walk doubler, and
  top skin.  When drilling out the center hole, I am getting bur/chip
  production between the layers.  
  
  I'm using a #19 jobber bit and going slow, but I am not able to avoid
  separation of the layers due to chips.  It's too tight to use a chip chaser
  without damaging the skins.  I was able to clean out the first two and then
  stopped to research before proceeding.
  
  Was this step completed for any others with QB wings or is this a standard
  task for the builder to complete?
  
  Any suggestions for avoiding the burrs/chips in between the layers while
  drilling?
  
  Best Regards,
  Patrick 40715   | 	    
   
     
    
     
 Jim "Scooter" McGrew
  http://www.mit.edu/~jsmcgrew  
   
 
  
          
   
 See what's new at AOL.com and .  
   [quote]   [b]
 
  |  | - The Matronics RV10-List Email Forum - |  |   |  Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
 
  http://www.matronics.com/Navigator?RV10-List |  
  |  
 
 
 
 
  | 
			 
		  | 
	 
	
		| Back to top | 
		 | 
	 
	
		  | 
	 
	
		Bill Reining
 
 
  Joined: 13 Aug 2007 Posts: 13 Location: Oakland, California
  | 
		
			
				 Posted: Tue Sep 25, 2007 8:57 am    Post subject: Re: QB Wings: Page 16-2 Step 3 | 
				     | 
			 
			
				
  | 
			 
			
				Be careful, there is a gotcha here.  One of the nutplates is different, such that the screw hole is on the side, rather than the middle.  The plans are correct.  See Tim Olsen's comments in his gotchas section here: http://www.myrv10.com/tips/gotchas.html
 
  |  | - The Matronics RV10-List Email Forum - |  |   |  Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
 
  http://www.matronics.com/Navigator?RV10-List |  
  |  
 
 
 
 
  _________________ Bill (and Jon) Reining
 
40514 | 
			 
		  | 
	 
	
		| Back to top | 
		 | 
	 
	
		  | 
	 
	
		VHMUM(at)bigpond.com Guest
 
 
 
 
 
  | 
		
			
				 Posted: Tue Sep 25, 2007 12:35 pm    Post subject: QB Wings: Page 16-2 Step 3 | 
				     | 
			 
			
				
  | 
			 
			
				Use a step drill to just under 19 and then 19 drill and then it will be 
 perfect
 
 Chris
 ---
 
  |  | - The Matronics RV10-List Email Forum - |  |   |  Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
 
  http://www.matronics.com/Navigator?RV10-List |  
  |  
 
 
 
 
  | 
			 
		  | 
	 
	
		| Back to top | 
		 | 
	 
	
		  | 
	 
	
		 | 
	 
 
  
	 
	    
	   | 
	
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You cannot vote in polls in this forum You cannot attach files in this forum You can download files in this forum
  | 
   
 
  
Powered by phpBB © 2001, 2005 phpBB Group
  
		 |